Interior Smith Remodeling Concierge logo

Primary baths, designed and built in one plan

Bathroom Remodeling in Indianapolis, from the floor plan to the last grout line

Bathroom remodeling is most of what we do. Alex draws the room, Jordan builds it, and we choose every tile, tub, vanity and light with you before demolition, so the estimate you approve describes the bathroom you actually get.

Primary bathroom with a long light-wood double vanity, black-framed mirrors, a marble-look floor and a freestanding tub at the far end

What a full primary bath remodel includes

A typical primary bath with us starts at the studs and ends with paint. We plan it as one room rather than a stack of separate jobs, because the size of the shower decides where the vanity goes, the vanity decides the lighting, and the tile ties all of it together.

  • Tear-out down to the framing where the plan calls for it
  • A custom tile shower with a niche, a bench and glass
  • A freestanding tub added, replaced or taken out
  • New vanity, countertop, sinks and faucets
  • Mirrors, light fixtures and can lights
  • Tile or LVP flooring through the whole room
  • Drywall and paint
  • Walls moved, gently, to rebalance the layout
  • Added storage: linen towers, shelving, wider cabinets
  • Plumbing fixtures and hardware in one matched finish

Hall, guest and basement bathrooms follow the same plan on a smaller scale. If the shower is the only thing that bothers you, start with our custom tile showers. If the tub is the problem, read how a tub-to-shower conversion works.

How a bathroom remodel runs with us, start to finish

1. The free consultation at your house

Both of us come. Alex measures the room and sketches the floor plan while we talk about why you want to remodel, what you've saved on your phone and what you'd like to spend. Before we leave you get a rough number, and nobody asks you to sign anything that day.

2. The design packet

Alex turns those measurements into a mood board, a floor plan and 3D renderings of your bathroom. The packet breaks the work out by trade: demo, rough-in plumbing and electrical, drywall, paint, tile and stone, finish carpentry, finish electrical and finish plumbing. You can see every part of the job before any of it starts.

Floor plan page from one of our design packets: a primary bath with a freestanding tub in a bay window, drawn to scale with dimensions
A floor plan page from a real packet. See ten sample pages from two packets.

3. The design presentation

You come to our office, walk through the renderings and see the full estimate. If it lands above your budget, we show you which choices are driving it and what can change without changing the look.

4. Selections with Alex

Alex goes with you to our vendors and you choose every finish: tile, countertop, vanity, glass, plumbing fixtures, lights, down to the door handles. Because the choices are made here, the estimate is built on real products rather than allowances.

5. The build

Our crew does the work, and we send you a daily update. You text the designer and the project lead directly, not an installer on his way out. If we find something behind a wall, or we make a mistake, we tell you that day and give you options.

6. The walkthrough

We walk the finished room with you and fix anything that isn't right. Our installation carries a 1-year warranty, and the manufacturers cover their own materials. If one of them fails, we help you find the right manufacturer.

Materials we put in primary baths most often

What each choice is good at
Part of the roomWhat we installWhy people choose it
Shower walls12×24 large-format porcelain, subway, vertical stacked tileLarge format means fewer grout lines; subway and stacked tile add pattern
Shower floorHex mosaic in black, gray or whiteSmall tiles follow the slope to the drain and give your feet more grip
Bathroom floorMarble-look porcelain, herringbone, wood-look LVPPorcelain carries the tile look across the room; LVP gives a tile or wood look with no tile to set
TubAcrylic or solid-surface freestandingAcrylic is lighter and costs less; solid surface has a heavier, stone-like feel
GlassFrameless panel, sliding door, half wall with glassFrameless has the fewest tracks and seals for minerals to cling to
VanityFloating wood, painted shaker, navy, single or double sinkFloating opens up floor; shaker suits a more traditional house
CountertopWhite quartz, graniteQuartz needs no sealing; granite brings natural movement
Metal finishMatte black, brushed brass, chromeMatte and brushed finishes hide water spots better than polished ones

Hard water is common around Indianapolis, which is why we steer people toward frameless glass, sealed grout and fixture finishes that don't show every spot.

Where a primary bath budget bends without looking cheaper

Four swaps we suggest first

  • Wood-look or stone-look LVP instead of floor tile. The material costs about the same, and there's no tile to set.
  • An acrylic freestanding tub instead of solid surface.
  • 12×24 large-format tile on the shower walls instead of a mosaic pattern.
  • A quality ready-to-assemble (RTA) vanity line, built on site, instead of custom cabinetry.

Our estimates start with mid-line, cost-efficient materials, so there's room to move down as well as up. The rest of the trade-offs are in our guide to what a bathroom remodel costs and where it bends.

Primary baths we've finished

White freestanding tub centered in a three-window bay with blue walls, floating shelves and a marble-look floor
Freestanding tub set into the bay window
Large walk-in shower behind frameless glass, white tile with a blue accent band and a marble-look floor with a herringbone inset
Frameless walk-in shower with a blue accent band
Long primary bathroom with white shaker vanities on both sides, a wood-look plank floor and a freestanding tub under the window
White vanities on two walls, tub at the window

We price the selections you've already made, so the final bill stays close to the proposal you signed.

They had a unique blend of designs that stood out, builders that did the job the right way, at a price without all the overhead. We are quite pleased with the end result and felt we got a great value - within $1k of their original proposal.
Michael M., Google review, March 2026

Bathroom remodeling questions

Other rooms, other towns

Every town we work in starts from a different house. See how we plan around everyday use in Carmel and Fishers, where to spend and where to save in Zionsville, and what older homes in Indianapolis tend to hide behind the walls.

Free in-home consultation

Show us the bathroom you've been putting up with

We'll measure it, sketch it and give you a rough number at your kitchen table.